jeff wittek excavator accident

  • MODULE 3—EXCAVATION AND TRENCHING

    WebOct 14, 2019 · The formula for estimating vacuum excavation costs. A 1-foot diameter hole at a depth of 5 feet = 3.9 cubic feet or 0.15 cubic yard. This is doubled to account for the volume of water used: 3.9 x 2 = 7.8 cubic feet 0.3 cubic yards. Now multiply that total by the number of holes to be excavated. For example, ten holes would produce 3 cubic yards

    Learn More
  • Microtrenching 101: Site Planning, Spoil Removal

    WebJul 2, 2019 · However, the minimum permissible distance of spoil from the edge of the excavation is 0.6 metres for every one metre of excavation depth. How close can spoil piles be to the excavation? 2-feet Keep Spoils at least 2-feet away from excavation areas. Under no scenario should you ever set spoils at the lip of a trench. Use a trench box or …

    Learn More
  • Hazards of Excavations Outline - Occupational Safety and …

    Webenter the excavation depth (feet and inches)for uneven depth calculate the average depth. swell of material (in percentage) shrinkage of material (in percentage) the amount of material that you can use on site and will be compacted (if needed, in cubic yards) the amount of material one truckload can hold (in cubic yards)

    Learn More
  • Reuse of Dry Excavation Spoils Can Save Your …

    WebMar 29, 2022 · Set equipment and spoils at least 2 feet apart when digging. Use the retaining device, for example, trench boxes, which will extend over the top of the trench to keep spoils and equipment from being thrown back into the trench. If the site does not allow a setback of 2 feet, the spoils could need to be transported temporarily to another site.

    Learn More
  • Hydroexcavation & Vacuum Excavation for Precise …

    Web1. Avoid placing excess spoils into stream courses and adjacent riparian zones where it could potentially result in sediment delivery to streams. 2. Drain spoil piles to prevent the concentration of flow and to prevent rill and gully erosion. 3. Spread material not to be re-used in compacted layers and generally conforming to the local

    Learn More
  • How far away from the excavation should the spoils be placed?

    WebAug 3, 2017 · Spoil piles must stay at least 2 feet back from the edge of the hole. This is measured from the point where the slough of the pile ends. Placing the spoil any closer exerts excessive pressure on the walls of the excavation and thus increases the chance of …

    Learn More
  • Trenching and Excavation Safety: Unsafe Spoil-Pile …

    WebSection 1: Excavation and Embankment: This section deals with the removal and/or addition of soil to the existing terrain. Section 2: Borrow Pit Volumes: There is some overlap with the section 1 and this section but this deals with taking soil from an existing location. The soil properties, volumes, and water content

    Learn More
  • Reuse of Dry Excavation Spoils Can Save Your …

    Web(a) General. Excess spoil shall be placed in designated disposal areas within the permit area, in a controlled manner to - (1) Minimize the adverse effects of leachate and surface water runoff from the fill on surface and ground waters; (2) Ensure mass stability and prevent mass movement during and after construction; and (3) Ensure that the final fill is suitable …

    Learn More
  • Excavation Material Removal Calculator

    WebTwo types of Spoil Piles are generated during excavation. The first is Temporary and must be no closer than 2 feet from the edge of the excavation. Soil placed in the Temporary Spoil Pile is to be removed to a Permanent Spoil Pile, located a great distance from the excavation, prior to workers entering the excavation.

    Learn More
  • How Far Spoil Piles and Equipment Must Be Kept - CenTex Excavation

    Webenter the excavation depth (feet and inches)for uneven depth calculate the average depth. swell of material (in percentage) shrinkage of material (in percentage) the amount of material that you can use on site and will be compacted (if needed, in cubic yards) the amount of material one truckload can hold (in cubic yards)

    Learn More
  • How to Excavate a Trench: 15 Steps (with Pictures)

    WebHYDRO VACUUM EXCAVATORS FEATURES & BENEFITS OPTIMAL POWER Equipped with 24.8-hp (18.5-kW), 49-hp (36.5-kW) and 74-hp (55.2-kW) Kubota ® diesel engines for more power and performance. PROVEN PRODUCTIVITY The HX Line provides optimal suction and water pressure for mid- and large-scale jobs and features a new patent-pending

    Learn More
  • Excavation Hazards and Control Measures (pdf) – …

    WebType C Soils are cohesive soils with an unconfined compressive strength of 0.5 tsf (48 kPa) or less. Other Type C soils include granular soils such as gravel, sand and loamy sand, submerged soil, soil from which water is freely seeping, and …

    Learn More
  • Cost-effective reduction and management of spoils from …

    WebExcavation—A man-made cut, cavity or hole in the ground made by removing earth. Trench—A narrow excavation (in relation to its length). In general, the depth is greater than the width. It is never more than 15 feet wide. Spoils—Thematerials (dirt, earth) that are removed from an excavated area.

    Learn More
  • Excavations and Trenching | OSHA Safety Manuals

    WebHydrovac spoils or soil mixed with water is created from the hydro-excavation activities. Hydrovac spoils are considered special waste and have to be solidified (dried out) prior to disposal or the wet soils could cause slope instability and the landfill. A3E manages the hydrovac spoils and directs them to the appropriate facilities for

    Learn More
  • Excavation Hazards and Control Measures (pdf) – …

    WebJul 2, 2019 · However, the minimum permissible distance of spoil from the edge of the excavation is 0.6 metres for every one metre of excavation depth. How close can spoil piles be to the excavation? 2-feet Keep Spoils at least 2-feet away from excavation areas. Under no scenario should you ever set spoils at the lip of a trench. Use a trench box or …

    Learn More
  • How to Calculate the Cost of Vacuum Excavation

    WebJul 29, 2022 · Excavation Spoils. The soil, dirt, and debris collected during excavation are referred to as "excavation spoils." To avoid risks from excavation wastes, the following factors should be taken into account. Avoid dumping debris within two feet of an excavation's edge. Take a measurement from the excavation edge to the closest …

    Learn More
  • Reuse of Dry Excavation Spoils Can Save Your …

    WebSpoil piles need to be located at least 2 feet away from the edge of the excavation, and it may need to be further away depending onconditions. Causes extra weight on the trench walls. vii. Falls b.Even properly supported trench can be dangerous if spoil canfall into excavation. To ensure the excavation is safe from falls: viii.

    Learn More
  • How to Excavate a Trench: 15 Steps (with Pictures)

    WebMar 30, 2021 · For microtrenching, the actual trench is fairly small. The trench generally ranges from .75-inches to 2.25-inches (1.9-cm to 5.7-cm) wide and up to 16-inches (40.6-cm) deep, which is typically above existing utilities. Knowing the width and depth of the trench can help you prepare for the project and understand what type of production to …

    Learn More
  • How far away from the excavation should the spoils be placed?

    WebSkid-mounted FX20 vacuum excavator can fit in the back of a pickup truck, on a flatbed trailer or a specially designed Ditch Witch trailer; in many cases no CDL is required. Features & Benefits Ease of Use 150-gallon (568-L) spoils tank is mounted permanently at a 45-degree angle, making the dumping cycle quick and easy.

    Learn More
  • OSHA Technical Manual (OTM) - Section V: Chapter 2

    WebSep 16, 2022 · Excavation methods used during the underground construction process generate excess spoils that must be properly treated and disposed of. This is often a multi-step process in which spoils are transported to one facility for treatment prior to disposal at a second location. Desired properties

    Learn More